Project Artifact: Value Realization Register

Document Reference: PMO-01.03

This document provides a comprehensive, professional reference to understand the purpose and effective usage of the Value Realization Register in alignment with the Tasleemat framework.


1. What?

A register that records, for each benefit the business case authorised, what the measure was before the project, what it was expected to be, what it has been measured at, and when. It carries the measurement method for each benefit, the owner accountable for it, the signed variance, and what is being done about any variance. It is a record of movement, not a plan, and it is expected to remain open well after the project has closed.


2. Why?

Because a value with no date and no baseline is not evidence of anything. A figure on its own can be anything: measured at the wrong moment, on a changed definition, against a baseline chosen afterwards. The register is what makes the claim checkable by someone who was not there, and it is the only artifact that still exists when the project team that could explain the numbers has dispersed.


3. When?

This artifact is primarily prepared, utilized, and updated during the BUSINESS AND VALUE DELIVERY Process Group of the project lifecycle. It opens with the benefits and runs until the last benefit is realised or formally withdrawn, which is usually beyond project closure and belongs to the business owner rather than the project team.


4. Who?

Responsibilities: Owned by the business owner, with the finance contributor accountable for the method by which value is measured. The project manager maintains the entries but does not own the benefits, and signing the register is an acceptance that the figures in it are the organisation's figures, not the project's.


Tailoring Tips


Alignment & Dependencies

1. Pre-requisites & Inputs (Upstream Dependencies)

2. Downstream Dependents


5. How?

To accurately and professionally complete the VALUE REALIZATION REGISTER, the responsible party must populate the following sections based on the project context (ensure parameters.md is referenced for global project variables):


📥 Associated Templates


6. Reference Example

A fully completed, gold-standard reference example illustrating this artifact in practice is available: