🚀 Getting Started with Tasleemat PMO Operating System
Document ID: TASLEEMAT-GUIDE-01-GETTING-STARTED
Version: 2.0
Target Audience: Project Managers, PMO Directors, Agile Coaches, Project Sponsors, AI Leads
🎯 Welcome to Tasleemat
Tasleemat (تسليمات) is a high-performance, enterprise-grade Project Management Office (PMO) Operating System. It delivers 114 standardized, bilingual (English & Arabic) deliverable forms (228 synchronized bilingual bundles) engineered in clean Markdown, accompanied by structural schemas (*.json, *.csv) and real-world reference implementations.
Whether you are running a multi-million-dollar infrastructure transformation, a lean agile sprint, or an innovative GenAI deployment, Tasleemat provides the exact governance baseline you need without bureaucratic bloat.
flowchart LR
A["1. Select Sizing Tier & Pack"] --> B["2. Tailor Deliverables"]
B --> C["3. Initiate Baseline"]
C --> D["4. Execute & Monitor"]
D --> E["5. Verify Stage Gates"]
E --> F["6. Close & Harvest Value"]
🧭 Step-by-Step Onboarding Workflow
Phase 1: Day 1 to Day 7 — Project Discovery & Sizing
- Determine Project Tier & Category:
- Consult
05_tailoring_profiles.md. - Classify your initiative into Tier 1 (Enterprise / Mega), Tier 2 (Standard / Core), or Tier 3 (Lean / Fast-Track), and select your Methodology Archetype Pack (General, Agile, AI Governance, Predictive, or Hybrid).
- Review Stage-Gate Requirements:
- Read
04_stage_gates_and_governance.mdto understand the 6 governance milestones (Gate 0 to Gate 5). - Draft the Strategic Foundation:
- If starting at portfolio level: Complete
00_01 Portfolio Roadmapand00_06 OKR Alignment. - Complete
01_01 Business Caseand03_01 Project Charter.
Phase 2: Day 8 to Day 21 — Planning & Baseline Authorization
- Establish the Triple Constraint Baseline:
- Scope: Complete
04_02_05 Scope Statementand04_02_06 WBS. - Schedule: Complete
04_03_08 Project Schedule. - Cost: Complete
04_04_04 Cost Baseline. - Assign Governance Roles & RACI:
- Consult
06_raci_authority_matrix.mdand fill04_06_04 RACI Matrix. - Pass Gate 2 (Integrated Baseline Review):
- Present the integrated baseline to the PMO and Sponsor for formal sign-off.
Phase 3: Day 22 Onward — Execution, Control, & Stage Gates
- Maintain Live Operational Logs:
- Track issues in
05_01 Issue Log. - Log decisions in
05_02 Decision Log. - Process change requests through
05_03 Change Requestand05_04 Change Log. - Measure Value & Variances:
- Run weekly or bi-weekly
06_01 Project Status Report. - Calculate EVM metrics via
06_05 Earned Value Analysis. - Pass Gate 4 & Gate 5 (Acceptance & Closure):
- Secure customer signoff using
06_08 Product Acceptance Form. - Handover to ops via
07_04 Transition Checklist. - Archive organizational assets using
07_03 Closeout Reportand07_01 Lessons Learned.
🗂️ How to Use Forms, Guides, and Examples
Every form in Tasleemat follows a strict three-part triad:
forms/en/03_Initiating/01_Project_Charter/
├── 03_01_Project_Charter_Template.md # The pure fillable template
├── 03_01_Project_Charter_Guide.md # Detailed instructions & alignment
├── 03_01_Project_Charter.json # Machine-readable schema definition
└── 03_01_Project_Charter.csv # Structured table column headers
examples/en/03_Initiating/01_Project_Charter/
└── 03_01_Project_Charter_Example.md # Fully filled enterprise example
- For the Author (PM / Lead):
- Open
*_Guide.mdfirst to understand mandatory inputs, RACI, and dependencies. - Copy
*_Template.mdto your working folder or project repo. - Fill in each bracketed placeholder
[ Specify ... ]. - Refer to
*_Example.mdinexamples/for benchmark inspiration. - For the Approver (Sponsor / PMO Director):
- Check the Document Control & Sign-off Table at the bottom of each deliverable.
- Verify alignment with upstream dependencies in
07_document_dependencies.md.
📚 Core Documentation Library
| Doc # | Guide Name | Target Audience | Key Topic |
|---|---|---|---|
| 02 | 02_usage_guide.md |
All Practitioners | Template fields, markdown rules, JSON/CSV tools |
| 03 | 03_pmo_policy_manual.md |
PMO & Executives | Corporate governance, change control, compliance |
| 04 | 04_stage_gates_and_governance.md |
PMs & Gate Reviewers | 6 Stage-Gates, entry/exit criteria, signoff |
| 05 | 05_tailoring_profiles.md |
PMs & PMO Leads | Project sizing matrix, 3-tier mandatory deliverables and methodology packs |
| 06 | 06_raci_authority_matrix.md |
Governance Officers | 114-deliverable RACI approval rights |
| 07 | 07_document_dependencies.md |
Architects & PMs | Upstream/downstream deliverable data flows |
| 08 | 08_ai_governance_framework.md |
AI PMs & Tech Leads | AI Canvas, Model Cards, Ethics, SDAIA/NIST |
| 09 | 09_agile_hybrid_integration.md |
Scrum Masters & PMs | Agile ceremonies, flow metrics, DoD, Sprints |
| 10 | 10_faq_and_troubleshooting.md |
All Users | 25+ practical answers to common obstacles |
| 11 | 11_tools_and_automation.md |
Developers & DevOps | Scripts, CI/CD, JIRA/Azure DevOps integration |
| 12 | 12_open_knowledge_framework.md |
Data Engineers & AI Architects | Open Knowledge Framework, Frictionless data package, FAIR data principles |
⚠️ Governance & Tailoring Disclaimer
> **Proposed Organizational Model:** Tasleemat is an open reference PMO framework designed to accelerate institutional delivery capability. It represents a proposed organizational model requiring formal tailoring and adoption by your enterprise governance authority. It does not establish statutory legal authority, certification, or mandatory compliance rules for external organizations.