❓ Frequently Asked Questions & Troubleshooting Guide
Document ID: TASLEEMAT-GUIDE-10-FAQ-TROUBLESHOOTING
Version: 2.0
Target Audience: Project Managers, PMO Officers, Auditors, System Integrators
💡 Top Frequently Asked Questions
General Architecture & Standards
Q1: Do I have to fill out all 114 deliverables for every project?
Answer: Absolutely not. Tasleemat is strictly tailored based on project size and methodology. Consult 05_tailoring_profiles.md. The catalog defines 3 Governance Sizing Tiers (Tier 1: Mega / 35–50 deliverables, Tier 2: Standard / 18–25 deliverables, Tier 3: Lean / 7–9 deliverables) and 5 Methodology Archetype Packs (general, agile, ai, predictive, hybrid). You only scaffold the required subset for your project.
Q2: What international standards does Tasleemat align with?
Answer: Tasleemat aligns with: - PMI PMBOK® Guide: 6th Edition (Process Groups & Knowledge Areas), 7th Edition (Performance Domains & Principles), and 8th Edition concepts. - NIST AI RMF 1.0 & ISO/IEC 42001: For Artificial Intelligence governance. - SDAIA AI Ethics & Saudi PDPL: For data privacy, ethics, and national regulatory compliance. - ISO 21500: Project, programme, and portfolio management guidance.
Q3: How do the Markdown, JSON, and CSV files work together?
Answer:
- The *_Template.md is the human-readable deliverable to be edited and signed.
- The *.json contains the schema definition and field constraints for programmatic validation and API integration.
- The *.csv provides standard table columns for direct import into Excel, Google Sheets, or PowerBI.
Customization & Workflow
Q4: Can I modify the tables or add custom fields to a template?
Answer: Yes. You may add domain-specific columns or appendices. However, to maintain PMO audit compliance, do not remove the Document Control & Sign-off table at the bottom of the template.
Q5: Who has the legal/governance authority to sign off on baselines?
Answer: Refer to 06_raci_authority_matrix.md. The Project Manager is Responsible (Author), while the Project Sponsor or Steering Committee is Accountable (Sign-off Authority).
Q6: How do we handle project changes during execution?
Answer: Any deviation from the approved baseline (Scope, Schedule, Budget) exceeding threshold limits must go through PMO-05.03 Change Request and be logged in PMO-05.04 Change Log with formal Change Control Board (CCB) approval.
🔧 Practical Troubleshooting & Common Pitfalls
Problem 1: "The project team complains about too much paperwork."
- Root Cause: The PM selected Tier 1 (Enterprise) forms for a small Tier 3 initiative.
- Solution: Re-run the project sizing assessment in
05_tailoring_profiles.md. Strip out non-mandatory forms immediately. Consolidate status tracking into06_01 Project Status Report.
Problem 2: "Earned Value Analysis numbers (CPI/SPI) do not match the status report."
- Root Cause: Discrepancy between Planned Value (PV) in the cost baseline and Actual Cost (AC) from accounting ledgers.
- Solution: Ensure that Earned Value (EV) is calculated strictly against completed WBS work packages as defined in
PMO-04.02.07 WBS Dictionary.
Problem 3: "Our AI model's accuracy dropped in production after deployment."
- Root Cause: Data drift or undetected distribution shifts in inference inputs.
- Solution: Check
PMO-02.05 AI Model Cardfor baseline performance slices. Execute remediation protocols specified inPMO-02.02 AI Governance Plan.