PMO-04.04.03 Phase 04: Planning

COST ESTIMATING WORKSHEET

ูˆุฑู‚ุฉ ุนู…ู„ ุชู‚ุฏูŠุฑ ุงู„ุชูƒู„ูุฉ
tasleemat asset PMO-04.04.03 template --lang en

Deliverable Summary & Governance Boundaries

Lifecycle Phase Alignment

Phase 04: Planning

Sizing Tier Requirements

Validation Contract

This deliverable conforms to a strict companion Draft 2020-12 JSON Schema for automated structural and semantic validation.

tasleemat validate PMO-04.04.03 ./completed_data.json

Template Markdown (Bilingual)

<!-- LLM INSTRUCTIONS: Fill in the [ Add details... ] placeholders based on project context.

Section Instructions:
- Labor and Staffing Cost Calculations: Provide comprehensive project data for all required fields in this section.
- Material and Equipment Cost Calculations: Provide comprehensive project data for all required fields in this section.
- Subcontractor and Vendor Cost Calculations: Provide comprehensive project data for all required fields in this section.
- Consolidated Cost Estimate Reconciliation: Provide comprehensive project data for all required fields in this section.
-->

<h3 align="right">{{Company_Name}}</h3>
<h2 align="right">{{Project_Name}} - {{Project_ID}}</h2>
<h1 align="center">COST ESTIMATING WORKSHEET</h1>

| **Date Prepared:** {{Current_Date}} | **Project Manager:** {{Project_Manager_Name}} | **Prepared By:** {{Prepared_By}} |
| :--- | :--- | :--- |

---

## 1. Labor and Staffing Cost Calculations

**Role Title and Headcount:**
[ Add details... ]

**Hours Allocation and Hourly Rate:**
[ Add details... ]

**Total Calculated Labor Cost:**
[ Add details... ]

---

## 2. Material and Equipment Cost Calculations

**Material or Equipment Item Description:**
[ Add details... ]

**Unit Quantity and Unit Purchase Price:**
[ Add details... ]

**Total Calculated Materials Cost:**
[ Add details... ]

---

## 3. Subcontractor and Vendor Cost Calculations

**Contracted Service or Work Package:**
[ Add details... ]

**Vendor Pricing Model and Contract Sum:**
[ Add details... ]

---

## 4. Consolidated Cost Estimate Reconciliation

**Grand Total Base Estimate:**
[ Add details... ]

**Worksheet Verification and Audit Sign-off:**
[ Add details... ]

---

### Sign-off and Approvals

| Role | Name | Signature | Date |
| :--- | :--- | :---: | :---: |
| **Cost Estimator** | {{Cost_Estimator_Name}} | _______________________ | [ .... - .... - .... ] |
| **Project Manager** | {{Project_Manager_Name}} | _______________________ | [ .... - .... - .... ] |
| **Finance Controller** | {{Finance_Controller_Name}} | _______________________ | [ .... - .... - .... ] |
---

<div align="right" style="margin-top: 20px; font-size: 12px; color: #7f8c8d;">
  <span>Electronic Audit Trail: Hash SHA256: {{Audit_Trail_SHA256_Hash}}</span> <br>
  <strong>Template:</strong> COST ESTIMATING WORKSHEET | <strong>Ref:</strong> PMO-04.04.03 <br>
  <i>Generated on: {{Current_Timestamp}}, by <a href="https://github.com/fakhruldeen/Tasleemat/" style="color: #7f8c8d;">Tasleemat</a></i>
</div>

User Guide & Practitioner Instructions

Tasleemat Forms Guide

Project Artifact: Cost Estimating Worksheet

Document Reference: PMO-04.04.03

This document provides a comprehensive, professional reference to understand the purpose and effective usage of the Cost Estimating Worksheet in alignment with the Tasleemat framework.


1. What?

A computational artifact detailing line-by-line financial calculations across labor, hardware, software, and outside services.


2. Why?

Provides mathematical transparency and defensible audit trails for all budgeted funds.


3. When?

Utilized during cost planning to aggregate bottom-up work package expenses.


4. Who?

Authored by Cost Estimator and Technical Leads, audited by Project Manager.


Tailoring Tips

  • Simplify for agile teams into sprint velocity capacity burn calculations.
  • Provide full Bill of Quantities (BOQ) line items for heavy civil and infrastructure works.

Alignment & Dependencies

1. Pre-requisites & Inputs (Upstream Dependencies)

  • Mandatory:
    • Work Breakdown Structure / WBS (PMO-04.02.06)
    • Project Schedule (PMO-04.03.08)
    • Resource Requirements (PMO-04.06.02)
  • Optional / Contextual:
    • Risk Register (PMO-04.08.02)
    • Procurement Strategy (PMO-04.09.02)

2. Downstream Dependents

  • Mandatory:
    • Cost Baseline (PMO-04.04.04)
    • Earned Value Analysis / EVA (PMO-06.05)
    • Variance Analysis (PMO-06.04)
  • Optional / Contextual:
    • Cost Estimating Worksheet (PMO-04.04.03)
    • Procurement Budget Plan (PMO-04.09.01)

5. How?

To accurately and professionally complete the Cost Estimating Worksheet, the responsible party must populate the following critical sections based on the project context (ensure parameters.md is referenced for global project variables):

  • Role Title and Headcount: Specific resource role, staffing level, and number of full-time equivalents (FTE).
  • Hours Allocation and Hourly Rate: Total planned working hours and authorized standard or contracted hourly billing rate.
  • Total Calculated Labor Cost: Subtotal labor expenditure calculated from hours multiplied by hourly rate.
  • Material or Equipment Item Description: Detailed description of physical supplies, hardware, server infrastructure, or licenses.
  • Unit Quantity and Unit Purchase Price: Required quantity and current quoted unit price per item.
  • Total Calculated Materials Cost: Subtotal materials expenditure calculated from quantity multiplied by unit price.
  • Contracted Service or Work Package: External vendor scope of work, milestone deliverables, or consulting package.
  • Vendor Pricing Model and Contract Sum: Fixed price, time-and-materials rate, or contracted service sum.
  • Grand Total Base Estimate: Sum of all labor, materials, equipment, and subcontractor cost line items.
  • Worksheet Verification and Audit Sign-off: Formal reconciliation verifying math accuracy and absence of duplicated cost items.

6. Reference Example

A fully completed, gold-standard reference example illustrating this artifact in practice is available:

๐Ÿ“– Completed Example: 04_04_03_Cost_Estimating_Worksheet_Example.md

LLM Generation Prompt & Agent Instructions

Cost Estimating Worksheet - Generation Prompt

System Instructions: This document contains instructions for generating the ยซCost Estimating Worksheetยป. When asked to fill this template, follow the section-by-section instructions below. Refer to parameters.md for project variables.

Context and Definition: A detailed bottom-up estimating worksheet providing line-item financial calculations for staffing, materials, tools, and vendor contracts.

Alignment & Dependencies: * Pre-requisites (Inputs): * Mandatory: Work Breakdown Structure / WBS (PMO-04.02.06), Project Schedule (PMO-04.03.08), Resource Requirements (PMO-04.06.02) * Optional: Risk Register (PMO-04.08.02), Procurement Strategy (PMO-04.09.02) * Downstream Dependents: * Mandatory: Cost Baseline (PMO-04.04.04), Earned Value Analysis / EVA (PMO-06.05), Variance Analysis (PMO-06.04) * Optional: Cost Estimating Worksheet (PMO-04.04.03), Procurement Budget Plan (PMO-04.09.01)


Labor and Staffing Cost Calculations

Role Title and Headcount

Instruction: Specific resource role, staffing level, and number of full-time equivalents (FTE).

Generated Value: [ Add details... ]

Hours Allocation and Hourly Rate

Instruction: Total planned working hours and authorized standard or contracted hourly billing rate.

Generated Value: [ Add details... ]

Total Calculated Labor Cost

Instruction: Subtotal labor expenditure calculated from hours multiplied by hourly rate.

Generated Value: [ Add details... ]

Material and Equipment Cost Calculations

Material or Equipment Item Description

Instruction: Detailed description of physical supplies, hardware, server infrastructure, or licenses.

Generated Value: [ Add details... ]

Unit Quantity and Unit Purchase Price

Instruction: Required quantity and current quoted unit price per item.

Generated Value: [ Add details... ]

Total Calculated Materials Cost

Instruction: Subtotal materials expenditure calculated from quantity multiplied by unit price.

Generated Value: [ Add details... ]

Subcontractor and Vendor Cost Calculations

Contracted Service or Work Package

Instruction: External vendor scope of work, milestone deliverables, or consulting package.

Generated Value: [ Add details... ]

Vendor Pricing Model and Contract Sum

Instruction: Fixed price, time-and-materials rate, or contracted service sum.

Generated Value: [ Add details... ]

Consolidated Cost Estimate Reconciliation

Grand Total Base Estimate

Instruction: Sum of all labor, materials, equipment, and subcontractor cost line items.

Generated Value: [ Add details... ]

Worksheet Verification and Audit Sign-off

Instruction: Formal reconciliation verifying math accuracy and absence of duplicated cost items.

Generated Value: [ Add details... ]


PMO-04.04.03 Phase 04: Planning Realistic Case Study Benchmark
Date Prepared
2026-03-15
Project Manager
Faisal Al-Harbi, PMP
Prepared By
Faisal Al-Harbi, PMP (Senior Project Manager)

Cost Estimating Worksheet (Reference Example)

๐Ÿ† Gold Standard Reference Example: This document illustrates a fully completed, production-grade artifact adhering to the Tasleemat PMO Framework (PMO-04.04). All company names, project references, and figures are realistic fictional simulations.


Apex Global Solutions

Apex Unified Cloud ERP & Supply Chain Modernization - PRJ-2026-ERP-01

COST ESTIMATING WORKSHEET


1. Labor and Staffing Cost Calculations

Role Title and Headcount: Preapproved Financial Resources & Budget Envelope: * Total Approved Capital & Operational Envelope: $3,500,000 USD, structured as: - Cloud SaaS Licensing & Infrastructure Subscription: $1,350,000 USD. - Systems Integration & Professional Engineering Services: $1,450,000 USD. - Organizational Change Management & User Enablement: $350,000 USD. - Management Contingency Reserve (10%): $350,000 USD.

Hours Allocation and Hourly Rate: Preapproved Financial Resources & Budget Envelope: * Total Approved Capital & Operational Envelope: $3,500,000 USD, structured as: - Cloud SaaS Licensing & Infrastructure Subscription: $1,350,000 USD. - Systems Integration & Professional Engineering Services: $1,450,000 USD. - Organizational Change Management & User Enablement: $350,000 USD. - Management Contingency Reserve (10%): $350,000 USD.

Total Calculated Labor Cost: Preapproved Financial Resources & Budget Envelope: * Total Approved Capital & Operational Envelope: $3,500,000 USD, structured as: - Cloud SaaS Licensing & Infrastructure Subscription: $1,350,000 USD. - Systems Integration & Professional Engineering Services: $1,450,000 USD. - Organizational Change Management & User Enablement: $350,000 USD. - Management Contingency Reserve (10%): $350,000 USD.


2. Material and Equipment Cost Calculations

Material or Equipment Item Description: Preapproved Financial Resources & Budget Envelope: * Total Approved Capital & Operational Envelope: $3,500,000 USD, structured as: - Cloud SaaS Licensing & Infrastructure Subscription: $1,350,000 USD. - Systems Integration & Professional Engineering Services: $1,450,000 USD. - Organizational Change Management & User Enablement: $350,000 USD. - Management Contingency Reserve (10%): $350,000 USD.

Unit Quantity and Unit Purchase Price: Preapproved Financial Resources & Budget Envelope: * Total Approved Capital & Operational Envelope: $3,500,000 USD, structured as: - Cloud SaaS Licensing & Infrastructure Subscription: $1,350,000 USD. - Systems Integration & Professional Engineering Services: $1,450,000 USD. - Organizational Change Management & User Enablement: $350,000 USD. - Management Contingency Reserve (10%): $350,000 USD.

Total Calculated Materials Cost: Preapproved Financial Resources & Budget Envelope: * Total Approved Capital & Operational Envelope: $3,500,000 USD, structured as: - Cloud SaaS Licensing & Infrastructure Subscription: $1,350,000 USD. - Systems Integration & Professional Engineering Services: $1,450,000 USD. - Organizational Change Management & User Enablement: $350,000 USD. - Management Contingency Reserve (10%): $350,000 USD.


3. Subcontractor and Vendor Cost Calculations

Contracted Service or Work Package: Preapproved Financial Resources & Budget Envelope: * Total Approved Capital & Operational Envelope: $3,500,000 USD, structured as: - Cloud SaaS Licensing & Infrastructure Subscription: $1,350,000 USD. - Systems Integration & Professional Engineering Services: $1,450,000 USD. - Organizational Change Management & User Enablement: $350,000 USD. - Management Contingency Reserve (10%): $350,000 USD.

Vendor Pricing Model and Contract Sum: Preapproved Financial Resources & Budget Envelope: * Total Approved Capital & Operational Envelope: $3,500,000 USD, structured as: - Cloud SaaS Licensing & Infrastructure Subscription: $1,350,000 USD. - Systems Integration & Professional Engineering Services: $1,450,000 USD. - Organizational Change Management & User Enablement: $350,000 USD. - Management Contingency Reserve (10%): $350,000 USD.


4. Consolidated Cost Estimate Reconciliation

Grand Total Base Estimate: Preapproved Financial Resources & Budget Envelope: * Total Approved Capital & Operational Envelope: $3,500,000 USD, structured as: - Cloud SaaS Licensing & Infrastructure Subscription: $1,350,000 USD. - Systems Integration & Professional Engineering Services: $1,450,000 USD. - Organizational Change Management & User Enablement: $350,000 USD. - Management Contingency Reserve (10%): $350,000 USD.

Worksheet Verification and Audit Sign-off: Preapproved Financial Resources & Budget Envelope: * Total Approved Capital & Operational Envelope: $3,500,000 USD, structured as: - Cloud SaaS Licensing & Infrastructure Subscription: $1,350,000 USD. - Systems Integration & Professional Engineering Services: $1,450,000 USD. - Organizational Change Management & User Enablement: $350,000 USD. - Management Contingency Reserve (10%): $350,000 USD.


Sign-off and Approvals

Role Name Signature Date
Cost Estimator Zaid Al-Ghamdi, CCEA [Electronically Signed] 2026-03-18
Project Manager Faisal Al-Harbi, PMP [Electronically Signed] 2026-03-18
Finance Controller Approved - Finance Controller Name [Electronically Signed] 2026-03-18
---
Template: COST ESTIMATING WORKSHEET | Ref: PMO-04.04.03
Generated on: 2026-03-15 10:00 UTC, by Tasleemat

Draft 2020-12 JSON Schema

Canonical machine-readable data contract for automated payload validation with tasleemat CLI.
{
  "$schema": "https://json-schema.org/draft/2020-12/schema",
  "$id": "https://tasleemat.pmo/schemas/completed/PMO-04.04.03.schema.json",
  "title": "Completed COST ESTIMATING WORKSHEET Data Contract",
  "description": "Additive structural schema validating completed COST ESTIMATING WORKSHEET artifact data payloads (PMO-04.04.03).",
  "type": "object",
  "properties": {
    "artifact_id": {
      "type": "string",
      "const": "PMO-04.04.03"
    },
    "metadata": {
      "type": "object",
      "properties": {
        "project_name": {
          "type": "string",
          "minLength": 1
        },
        "project_code": {
          "type": "string"
        },
        "date_prepared": {
          "type": "string",
          "format": "date"
        },
        "project_manager": {
          "type": "string",
          "minLength": 1
        },
        "prepared_by": {
          "type": "string",
          "minLength": 1
        },
        "version": {
          "type": "string"
        },
        "status": {
          "type": "string",
          "enum": [
            "draft",
            "baselined",
            "in_review",
            "approved"
          ]
        }
      },
      "required": [
        "project_name",
        "date_prepared",
        "project_manager",
        "prepared_by"
      ]
    },
    "labor_and_staffing_cost_calculations": {
      "type": "object",
      "properties": {
        "role_title_and_headcount": {
          "type": "string",
          "minLength": 1,
          "description": "Specific resource role, staffing level, and number of full-time equivalents (FTE)."
        },
        "hours_allocation_and_hourly_rate": {
          "type": "string",
          "minLength": 1,
          "description": "Total planned working hours and authorized standard or contracted hourly billing rate."
        },
        "total_calculated_labor_cost": {
          "type": "string",
          "minLength": 1,
          "description": "Subtotal labor expenditure calculated from hours multiplied by hourly rate."
        }
      },
      "required": [
        "role_title_and_headcount",
        "hours_allocation_and_hourly_rate",
        "total_calculated_labor_cost"
      ]
    },
    "material_and_equipment_cost_calculations": {
      "type": "object",
      "properties": {
        "material_or_equipment_item_description": {
          "type": "string",
          "minLength": 1,
          "description": "Detailed description of physical supplies, hardware, server infrastructure, or licenses."
        },
        "unit_quantity_and_unit_purchase_price": {
          "type": "string",
          "minLength": 1,
          "description": "Required quantity and current quoted unit price per item."
        },
        "total_calculated_materials_cost": {
          "type": "string",
          "minLength": 1,
          "description": "Subtotal materials expenditure calculated from quantity multiplied by unit price."
        }
      },
      "required": [
        "material_or_equipment_item_description",
        "unit_quantity_and_unit_purchase_price",
        "total_calculated_materials_cost"
      ]
    },
    "subcontractor_and_vendor_cost_calculations": {
      "type": "object",
      "properties": {
        "contracted_service_or_work_package": {
          "type": "string",
          "minLength": 1,
          "description": "External vendor scope of work, milestone deliverables, or consulting package."
        },
        "vendor_pricing_model_and_contract_sum": {
          "type": "string",
          "minLength": 1,
          "description": "Fixed price, time-and-materials rate, or contracted service sum."
        }
      },
      "required": [
        "contracted_service_or_work_package",
        "vendor_pricing_model_and_contract_sum"
      ]
    },
    "consolidated_cost_estimate_reconciliation": {
      "type": "object",
      "properties": {
        "grand_total_base_estimate": {
          "type": "string",
          "minLength": 1,
          "description": "Sum of all labor, materials, equipment, and subcontractor cost line items."
        },
        "worksheet_verification_and_audit_sign_off": {
          "type": "string",
          "minLength": 1,
          "description": "Formal reconciliation verifying math accuracy and absence of duplicated cost items."
        }
      },
      "required": [
        "grand_total_base_estimate",
        "worksheet_verification_and_audit_sign_off"
      ]
    }
  },
  "required": [
    "artifact_id",
    "metadata",
    "labor_and_staffing_cost_calculations",
    "material_and_equipment_cost_calculations",
    "subcontractor_and_vendor_cost_calculations",
    "consolidated_cost_estimate_reconciliation"
  ]
}
๐Ÿ“‹ Form Field Definitions Dictionary (Legacy Specification)
{
  "form_name": "COST ESTIMATING WORKSHEET",
  "document_reference": "PMO-04.04.03",
  "_llm_instructions": "Populate the fields of 'COST ESTIMATING WORKSHEET' and write the value of each field under 'Generated Value', based on the project context. Context: the project carrying reference PMO-04.04.03.",
  "project_title": "",
  "date_prepared": "",
  "fields": {
    "f01_Role_Title_and_Headcount": {
      "section": "Labor and Staffing Cost Calculations",
      "label": "Role Title and Headcount",
      "guidance": "Specific resource role, staffing level, and number of full-time equivalents (FTE).",
      "value": ""
    },
    "f02_Hours_Allocation_and_Hourly_Rate": {
      "section": "Labor and Staffing Cost Calculations",
      "label": "Hours Allocation and Hourly Rate",
      "guidance": "Total planned working hours and authorized standard or contracted hourly billing rate.",
      "value": ""
    },
    "f03_Total_Calculated_Labor_Cost": {
      "section": "Labor and Staffing Cost Calculations",
      "label": "Total Calculated Labor Cost",
      "guidance": "Subtotal labor expenditure calculated from hours multiplied by hourly rate.",
      "value": ""
    },
    "f04_Material_or_Equipment_Item_Description": {
      "section": "Material and Equipment Cost Calculations",
      "label": "Material or Equipment Item Description",
      "guidance": "Detailed description of physical supplies, hardware, server infrastructure, or licenses.",
      "value": ""
    },
    "f05_Unit_Quantity_and_Unit_Purchase_Price": {
      "section": "Material and Equipment Cost Calculations",
      "label": "Unit Quantity and Unit Purchase Price",
      "guidance": "Required quantity and current quoted unit price per item.",
      "value": ""
    },
    "f06_Total_Calculated_Materials_Cost": {
      "section": "Material and Equipment Cost Calculations",
      "label": "Total Calculated Materials Cost",
      "guidance": "Subtotal materials expenditure calculated from quantity multiplied by unit price.",
      "value": ""
    },
    "f07_Contracted_Service_or_Work_Package": {
      "section": "Subcontractor and Vendor Cost Calculations",
      "label": "Contracted Service or Work Package",
      "guidance": "External vendor scope of work, milestone deliverables, or consulting package.",
      "value": ""
    },
    "f08_Vendor_Pricing_Model_and_Contract_Sum": {
      "section": "Subcontractor and Vendor Cost Calculations",
      "label": "Vendor Pricing Model and Contract Sum",
      "guidance": "Fixed price, time-and-materials rate, or contracted service sum.",
      "value": ""
    },
    "f09_Grand_Total_Base_Estimate": {
      "section": "Consolidated Cost Estimate Reconciliation",
      "label": "Grand Total Base Estimate",
      "guidance": "Sum of all labor, materials, equipment, and subcontractor cost line items.",
      "value": ""
    },
    "f10_Worksheet_Verification_and_Audit_Sign_off": {
      "section": "Consolidated Cost Estimate Reconciliation",
      "label": "Worksheet Verification and Audit Sign-off",
      "guidance": "Formal reconciliation verifying math accuracy and absence of duplicated cost items.",
      "value": ""
    }
  }
}