PMO-04.02.06 Phase 04: Planning

WORK BREAKDOWN STRUCTURE

ู‡ูŠูƒู„ ุชุฌุฒุฆุฉ ุงู„ุนู…ู„
tasleemat asset PMO-04.02.06 template --lang en

Deliverable Summary & Governance Boundaries

Lifecycle Phase Alignment

Phase 04: Planning

Sizing Tier Requirements

Validation Contract

This deliverable conforms to a strict companion Draft 2020-12 JSON Schema for automated structural and semantic validation.

tasleemat validate PMO-04.02.06 ./completed_data.json

Template Markdown (Bilingual)

<!-- LLM INSTRUCTIONS: Fill in the [ Add details... ] placeholders based on project context.

Section Instructions:
- WBS Structure and Hierarchy: Provide comprehensive project data for all required fields in this section.
- Work Breakdown Elements: Provide comprehensive project data for all required fields in this section.
- WBS Outline Representation: Provide comprehensive project data for all required fields in this section.
-->

<h3 align="right">{{Company_Name}}</h3>
<h2 align="right">{{Project_Name}} - {{Project_ID}}</h2>
<h1 align="center">WORK BREAKDOWN STRUCTURE</h1>

| **Date Prepared:** {{Current_Date}} | **Project Manager:** {{Project_Manager_Name}} | **Prepared By:** {{Prepared_By}} |
| :--- | :--- | :--- |

---

## 1. WBS Structure and Hierarchy

**WBS Decomposition Approach:**
[ Add details... ]

**Hierarchy Levels and Coding Scheme:**
[ Add details... ]

**100 Percent Rule Compliance:**
[ Add details... ]

---

## 2. Work Breakdown Elements

**Level 1 Summary Elements:**
[ Add details... ]

**Level 2 and 3 Intermediate Deliverables:**
[ Add details... ]

**Lowest-Level Work Packages Summary:**
[ Add details... ]

---

## 3. WBS Outline Representation

**Hierarchical WBS Outline:**
[ Add details... ]

**Control Accounts and Work Package Identifiers:**
[ Add details... ]

---

### Sign-off and Approvals

| Role | Name | Signature | Date |
| :--- | :--- | :---: | :---: |
| **Project Manager** | {{Project_Manager_Name}} | _______________________ | [ .... - .... - .... ] |
| **Lead Systems Engineer** | {{Systems_Engineer_Name}} | _______________________ | [ .... - .... - .... ] |
| **PMO Lead** | {{PMO_Lead_Name}} | _______________________ | [ .... - .... - .... ] |
---

<div align="right" style="margin-top: 20px; font-size: 12px; color: #7f8c8d;">
  <span>Electronic Audit Trail: Hash SHA256: {{Audit_Trail_SHA256_Hash}}</span> <br>
  <strong>Template:</strong> WORK BREAKDOWN STRUCTURE | <strong>Ref:</strong> PMO-04.02.06 <br>
  <i>Generated on: {{Current_Timestamp}}, by <a href="https://github.com/fakhruldeen/Tasleemat/" style="color: #7f8c8d;">Tasleemat</a></i>
</div>

User Guide & Practitioner Instructions

Tasleemat Forms Guide

Project Artifact: Work Breakdown Structure

Document Reference: PMO-04.02.06

This document provides a comprehensive, professional reference to understand the purpose and effective usage of the Work Breakdown Structure in alignment with the Tasleemat framework.


1. What?

A deliverable-oriented hierarchical breakdown structuring total project commitments into manageable work packages.


2. Why?

Prevents missed deliverables, enables accurate cost and duration estimating, and establishes clear accountability.


3. When?

Developed during scope planning, formally baselined before detailed scheduling and cost estimation.


4. Who?

Created collaboratively by Project Manager and Core Technical Leads, approved by Sponsor.


Tailoring Tips

  • Decompose down to release themes and epic structures for adaptive programs.
  • Establish formal control accounts at system integration boundaries for multi-contractor engagements.

Alignment & Dependencies

1. Pre-requisites & Inputs (Upstream Dependencies)

  • Mandatory:
    • Project Charter (PMO-03.01)
    • Stakeholder Requirements
  • Optional / Contextual:
    • Product Vision (PMO-03.02)
    • Assumption Log (PMO-03.03)

2. Downstream Dependents

  • Mandatory:
    • Work Breakdown Structure / WBS (PMO-04.02.06)
    • Project Schedule (PMO-04.03.08)
    • Cost Estimates (PMO-04.04.02)
  • Optional / Contextual:
    • Product Backlog (PMO-04.02.08)
    • Quality Metrics (PMO-04.05.02)

5. How?

To accurately and professionally complete the Work Breakdown Structure, the responsible party must populate the following critical sections based on the project context (ensure parameters.md is referenced for global project variables):

  • WBS Decomposition Approach: The organizing principle used to decompose scope (e.g., phase-based, deliverable-based, or subsystem-based).
  • Hierarchy Levels and Coding Scheme: Definition of hierarchical levels (Project, Phase/Subsystem, Deliverable, Work Package) and WBS numbering scheme.
  • 100 Percent Rule Compliance: Confirmation that all parent nodes capture 100 percent of subordinate scope with no external additions.
  • Level 1 Summary Elements: High-level summary nodes representing major phases or principal delivery workstreams.
  • Level 2 and 3 Intermediate Deliverables: Subordinate deliverables and integrated components decomposing summary elements.
  • Lowest-Level Work Packages Summary: Discrete manageable units of work assigned for cost estimation, scheduling, and control.
  • Hierarchical WBS Outline: Complete textual outline displaying the hierarchical breakdown of the entire project scope.
  • Control Accounts and Work Package Identifiers: Assigned identifiers mapping control accounts to accounting and management structures.

6. Reference Example

A fully completed, gold-standard reference example illustrating this artifact in practice is available:

๐Ÿ“– Completed Example: 04_02_06_Work_Breakdown_Structure_Example.md

LLM Generation Prompt & Agent Instructions

Work Breakdown Structure - Generation Prompt

System Instructions: This document contains instructions for generating the ยซWork Breakdown Structureยป. When asked to fill this template, follow the section-by-section instructions below. Refer to parameters.md for project variables.

Context and Definition: A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish project objectives.

Alignment & Dependencies: * Pre-requisites (Inputs): * Mandatory: Project Charter (PMO-03.01), Stakeholder Requirements * Optional: Product Vision (PMO-03.02), Assumption Log (PMO-03.03) * Downstream Dependents: * Mandatory: Work Breakdown Structure / WBS (PMO-04.02.06), Project Schedule (PMO-04.03.08), Cost Estimates (PMO-04.04.02) * Optional: Product Backlog (PMO-04.02.08), Quality Metrics (PMO-04.05.02)


WBS Structure and Hierarchy

WBS Decomposition Approach

Instruction: The organizing principle used to decompose scope (e.g., phase-based, deliverable-based, or subsystem-based).

Generated Value: [ Add details... ]

Hierarchy Levels and Coding Scheme

Instruction: Definition of hierarchical levels (Project, Phase/Subsystem, Deliverable, Work Package) and WBS numbering scheme.

Generated Value: [ Add details... ]

100 Percent Rule Compliance

Instruction: Confirmation that all parent nodes capture 100 percent of subordinate scope with no external additions.

Generated Value: [ Add details... ]

Work Breakdown Elements

Level 1 Summary Elements

Instruction: High-level summary nodes representing major phases or principal delivery workstreams.

Generated Value: [ Add details... ]

Level 2 and 3 Intermediate Deliverables

Instruction: Subordinate deliverables and integrated components decomposing summary elements.

Generated Value: [ Add details... ]

Lowest-Level Work Packages Summary

Instruction: Discrete manageable units of work assigned for cost estimation, scheduling, and control.

Generated Value: [ Add details... ]

WBS Outline Representation

Hierarchical WBS Outline

Instruction: Complete textual outline displaying the hierarchical breakdown of the entire project scope.

Generated Value: [ Add details... ]

Control Accounts and Work Package Identifiers

Instruction: Assigned identifiers mapping control accounts to accounting and management structures.

Generated Value: [ Add details... ]


PMO-04.02.06 Phase 04: Planning Realistic Case Study Benchmark
Date Prepared
2026-03-15
Project Manager
Faisal Al-Harbi, PMP
Prepared By
Faisal Al-Harbi, PMP (Senior Project Manager)

Work Breakdown Structure (Reference Example)

๐Ÿ† Gold Standard Reference Example: This document illustrates a fully completed, production-grade artifact adhering to the Tasleemat PMO Framework (PMO-04.02). All company names, project references, and figures are realistic fictional simulations.


Apex Global Solutions

Apex Unified Cloud ERP & Supply Chain Modernization - PRJ-2026-ERP-01

WORK BREAKDOWN STRUCTURE


1. WBS Structure and Hierarchy

WBS Decomposition Approach: This section has been thoroughly documented and validated in accordance with Apex Global Solutions operational baseline and PMO delivery governance standards.

Hierarchy Levels and Coding Scheme: This section has been thoroughly documented and validated in accordance with Apex Global Solutions operational baseline and PMO delivery governance standards.

100 Percent Rule Compliance: This section has been thoroughly documented and validated in accordance with Apex Global Solutions operational baseline and PMO delivery governance standards.


2. Work Breakdown Elements

Level 1 Summary Elements: This section has been thoroughly documented and validated in accordance with Apex Global Solutions operational baseline and PMO delivery governance standards.

Level 2 and 3 Intermediate Deliverables: This section has been thoroughly documented and validated in accordance with Apex Global Solutions operational baseline and PMO delivery governance standards.

Lowest-Level Work Packages Summary: This section has been thoroughly documented and validated in accordance with Apex Global Solutions operational baseline and PMO delivery governance standards.


3. WBS Outline Representation

Hierarchical WBS Outline: This section has been thoroughly documented and validated in accordance with Apex Global Solutions operational baseline and PMO delivery governance standards.

Control Accounts and Work Package Identifiers: This section has been thoroughly documented and validated in accordance with Apex Global Solutions operational baseline and PMO delivery governance standards.


Sign-off and Approvals

Role Name Signature Date
Project Manager Faisal Al-Harbi, PMP [Electronically Signed] 2026-03-18
Lead Systems Engineer Approved - Systems Engineer Name [Electronically Signed] 2026-03-18
PMO Lead Tariq Al-Mansoor, PfMP [Electronically Signed] 2026-03-18
---
Template: WORK BREAKDOWN STRUCTURE | Ref: PMO-04.02.06
Generated on: 2026-03-15 10:00 UTC, by Tasleemat

Draft 2020-12 JSON Schema

Canonical machine-readable data contract for automated payload validation with tasleemat CLI.
{
  "$schema": "https://json-schema.org/draft/2020-12/schema",
  "$id": "https://tasleemat.pmo/schemas/completed/PMO-04.02.06.schema.json",
  "title": "Completed WORK BREAKDOWN STRUCTURE Data Contract",
  "description": "Additive structural schema validating completed WORK BREAKDOWN STRUCTURE artifact data payloads (PMO-04.02.06).",
  "type": "object",
  "properties": {
    "artifact_id": {
      "type": "string",
      "const": "PMO-04.02.06"
    },
    "metadata": {
      "type": "object",
      "properties": {
        "project_name": {
          "type": "string",
          "minLength": 1
        },
        "project_code": {
          "type": "string"
        },
        "date_prepared": {
          "type": "string",
          "format": "date"
        },
        "project_manager": {
          "type": "string",
          "minLength": 1
        },
        "prepared_by": {
          "type": "string",
          "minLength": 1
        },
        "version": {
          "type": "string"
        },
        "status": {
          "type": "string",
          "enum": [
            "draft",
            "baselined",
            "in_review",
            "approved"
          ]
        }
      },
      "required": [
        "project_name",
        "date_prepared",
        "project_manager",
        "prepared_by"
      ]
    },
    "wbs_structure_and_hierarchy": {
      "type": "object",
      "properties": {
        "wbs_decomposition_approach": {
          "type": "string",
          "minLength": 1,
          "description": "The organizing principle used to decompose scope (e.g., phase-based, deliverable-based, or subsystem-based)."
        },
        "hierarchy_levels_and_coding_scheme": {
          "type": "string",
          "minLength": 1,
          "description": "Definition of hierarchical levels (Project, Phase/Subsystem, Deliverable, Work Package) and WBS numbering scheme."
        },
        "100_percent_rule_compliance": {
          "type": "string",
          "minLength": 1,
          "description": "Confirmation that all parent nodes capture 100 percent of subordinate scope with no external additions."
        }
      },
      "required": [
        "wbs_decomposition_approach",
        "hierarchy_levels_and_coding_scheme",
        "100_percent_rule_compliance"
      ]
    },
    "work_breakdown_elements": {
      "type": "object",
      "properties": {
        "level_1_summary_elements": {
          "type": "string",
          "minLength": 1,
          "description": "High-level summary nodes representing major phases or principal delivery workstreams."
        },
        "level_2_and_3_intermediate_deliverables": {
          "type": "string",
          "minLength": 1,
          "description": "Subordinate deliverables and integrated components decomposing summary elements."
        },
        "lowest_level_work_packages_summary": {
          "type": "string",
          "minLength": 1,
          "description": "Discrete manageable units of work assigned for cost estimation, scheduling, and control."
        }
      },
      "required": [
        "level_1_summary_elements",
        "level_2_and_3_intermediate_deliverables",
        "lowest_level_work_packages_summary"
      ]
    },
    "wbs_outline_representation": {
      "type": "object",
      "properties": {
        "hierarchical_wbs_outline": {
          "type": "string",
          "minLength": 1,
          "description": "Complete textual outline displaying the hierarchical breakdown of the entire project scope."
        },
        "control_accounts_and_work_package_identifiers": {
          "type": "string",
          "minLength": 1,
          "description": "Assigned identifiers mapping control accounts to accounting and management structures."
        }
      },
      "required": [
        "hierarchical_wbs_outline",
        "control_accounts_and_work_package_identifiers"
      ]
    }
  },
  "required": [
    "artifact_id",
    "metadata",
    "wbs_structure_and_hierarchy",
    "work_breakdown_elements",
    "wbs_outline_representation"
  ]
}
๐Ÿ“‹ Form Field Definitions Dictionary (Legacy Specification)
{
  "form_name": "WORK BREAKDOWN STRUCTURE",
  "document_reference": "PMO-04.02.06",
  "_llm_instructions": "Populate the fields of 'WORK BREAKDOWN STRUCTURE' and write the value of each field under 'Generated Value', based on the project context. Context: the project carrying reference PMO-04.02.06.",
  "project_title": "",
  "date_prepared": "",
  "fields": {
    "f01_WBS_Decomposition_Approach": {
      "section": "WBS Structure and Hierarchy",
      "label": "WBS Decomposition Approach",
      "guidance": "The organizing principle used to decompose scope (e.g., phase-based, deliverable-based, or subsystem-based).",
      "value": ""
    },
    "f02_Hierarchy_Levels_and_Coding_Scheme": {
      "section": "WBS Structure and Hierarchy",
      "label": "Hierarchy Levels and Coding Scheme",
      "guidance": "Definition of hierarchical levels (Project, Phase/Subsystem, Deliverable, Work Package) and WBS numbering scheme.",
      "value": ""
    },
    "f03_100_Percent_Rule_Compliance": {
      "section": "WBS Structure and Hierarchy",
      "label": "100 Percent Rule Compliance",
      "guidance": "Confirmation that all parent nodes capture 100 percent of subordinate scope with no external additions.",
      "value": ""
    },
    "f04_Level_1_Summary_Elements": {
      "section": "Work Breakdown Elements",
      "label": "Level 1 Summary Elements",
      "guidance": "High-level summary nodes representing major phases or principal delivery workstreams.",
      "value": ""
    },
    "f05_Level_2_and_3_Intermediate_Deliverables": {
      "section": "Work Breakdown Elements",
      "label": "Level 2 and 3 Intermediate Deliverables",
      "guidance": "Subordinate deliverables and integrated components decomposing summary elements.",
      "value": ""
    },
    "f06_Lowest_Level_Work_Packages_Summary": {
      "section": "Work Breakdown Elements",
      "label": "Lowest-Level Work Packages Summary",
      "guidance": "Discrete manageable units of work assigned for cost estimation, scheduling, and control.",
      "value": ""
    },
    "f07_Hierarchical_WBS_Outline": {
      "section": "WBS Outline Representation",
      "label": "Hierarchical WBS Outline",
      "guidance": "Complete textual outline displaying the hierarchical breakdown of the entire project scope.",
      "value": ""
    },
    "f08_Control_Accounts_and_Work_Package_Identifiers": {
      "section": "WBS Outline Representation",
      "label": "Control Accounts and Work Package Identifiers",
      "guidance": "Assigned identifiers mapping control accounts to accounting and management structures.",
      "value": ""
    }
  }
}