AI Readiness Assessment
tasleemat asset PMO-02.03 template --lang en
Deliverable Summary & Governance Boundaries
Lifecycle Phase Alignment
Phase 02: Project Approach and Tailoring
Sizing Tier Requirements
Tier 1 Tier 2 Tier 3
Validation Contract
This deliverable conforms to a strict companion Draft 2020-12 JSON Schema for automated structural and semantic validation.
tasleemat validate PMO-02.03 ./completed_data.json
Template Markdown (Bilingual)
<!--
LLM INSTRUCTIONS: Fill in the [ Add details... ] placeholders based on project context.
Section Instructions:
**1. Purpose and Scope of the Assessment**
* **Assessment Objective:** What decision this assessment is being made to support, and what decision it is not. A readiness assessment with no stated decision attached is a score, and a score nobody needs is the one most often abandoned.
* **Assessment Scope:** Which systems, processes and teams are in scope, and which are excluded. Excluding something is legitimate; excluding it without writing it down is what lets it reappear as a dependency in month four.
* **Assessment Method:** How each dimension was assessed: instrumented measurement, walkthrough, interview, or self-declaration. Self-declaration is legitimate and must be labelled, because an unlabelled self-declaration is indistinguishable from a measurement and is trusted accordingly.
* **Assessor and Date:** Who performed it, on what date, and against which version of the systems. A readiness figure without a date is a figure that decays silently.
* **Evidence Basis:** What the scores rest on, and where the evidence sits. A score whose source cannot be retrieved cannot be defended when it is challenged, which is the only time its accuracy matters.
**2. Data Readiness**
* **Data Availability:** Whether the data the use case requires exists, at the volume and coverage needed. Availability is not the same as permission, and the gap between them is the most common reason a data-ready organisation is not an AI-ready one.
* **Data Quality:** Completeness, consistency, timeliness and validity, each with the measurement used. "Good quality" is a conclusion; a completeness figure against a defined field list is an input to one.
* **Data Lineage and Documentation:** Whether it can be traced to its origin and meaning. Lineage is what makes a defective output diagnosable rather than merely wrong, and it cannot be reconstructed after the fact.
* **Labelling and Ground Truth:** Whether labelled examples exist for the intended purpose, in sufficient quantity and quality. Where they do not, say so, because labelling is a programme of work with a cost and a duration, and treating it as a task hides both.
* **Data Governance and Access:** Who may access what, under what controls, and whether that is settled. Access rights settled late are the usual cause of a launch delay that no one predicted, and they are settled late because they involve people outside the team.
**3. Technical and Platform Readiness**
* **Compute and Capacity:** Whether the capacity required for training and inference exists, and at what cost. Cost per unit of work is the figure that decides whether the use case is viable at volume, and it is not known until the volume is.
* **Platform and Tooling:** MLOps, versioning, experiment tracking, deployment and monitoring. The tooling question is not whether a notebook runs but whether a model can be reproduced, rolled back, and monitored in production, since those are the operations a team inherits.
* **Integration:** Whether the system connects to the surrounding estate, and at what quality. Integration is where readiness assessments are optimistic, because a proof of concept connects to nothing and a production system must connect to everything.
* **Security and Resilience:** The controls in force for AI workloads, and what happens when the system is unavailable. A system whose fallback is manual reverts to a process that was automated because it was unworkable by hand.
* **Scalability:** Whether performance and cost hold as volume grows. A model that is accurate and unaffordable at ten times the volume is a prototype, and the assessment is where that is cheapest to discover.
**4. Skills and Team Readiness**
* **Team Composition:** Who is on the team, and which of the required roles are unfilled. List the gaps by role rather than by competence, because a gap named by competence has no owner and a gap named by role has a vacancy.
* **AI Skills:** The specific capabilities present, at what level: building, evaluating, deploying, and operating. These are different skills and a team strong in the first may be unable to do the third, which is where readiness usually fails.
* **Domain Expertise:** Whether the team includes people who know the domain well enough to judge an output is wrong. Without them the team can measure performance and not interpret it, and those are not separable.
* **Capacity and Availability:** Whether the people named are actually available at the required fraction, given other commitments. A team rostered at half time and a team absent are the same fact expressed differently.
* **Capability Building:** How gaps will be closed: hire, train, partner, or buy. These have different lead times and the lead time is the constraint, not the preference.
**5. Organisational Readiness**
* **Leadership Sponsorship:** Whether there is a sponsor who will fund the consequences as well as the work. Sponsorship that ends at approval has funded a demonstration, and the difference surfaces at the first decision the system makes that somebody disputes.
* **Operating Model:** Who runs the system in production, and under which service commitment. An operating model decided at go-live is an operating model negotiated in an incident.
* **Change and Adoption:** Who must change their work, what they gain, and what they lose. A system that makes someone's judgement redundant will not be adopted regardless of its accuracy, and adoption is not a communications problem.
* **Procurement and Contracting:** Whether the contracts permit the intended use, and what they permit the supplier to do with the data. These are the obligations that cannot be renegotiated after the data has been shared.
* **Risk Appetite:** What level of failure the organisation will accept, and who accepts it on its behalf. A risk appetite that is never stated becomes, by default, zero tolerance, which is not a position anyone chose.
**6. Assessment Outcome and Route Forward**
* **Dimension Scores:** The score for each dimension, with the scale used stated. A score without its scale cannot be compared with a later assessment, and the comparison is the only reason to take the first one.
* **Weighted Overall Score:** The aggregate, with the weights and their justification. An unweighted average treats a dimension the business does not depend on as equal to one it cannot operate without.
* **Blocking Gaps:** The gaps that prevent proceeding, as distinct from those that slow it. This distinction is the assessment's actual output, and a form that records a single list cannot make it.
* **Recommended Route:** Proceed, proceed with conditions, remediate, or do not proceed, and the condition attached. The route without its conditions is an opinion; the conditions are what can be tracked and closed.
* **Remediation Plan:** What will be done, by whom, by when, and what it costs. A gap with no owner and no date is not a gap in the plan, it is a gap in the plan's assumptions.
* **Reassessment Trigger:** What would cause the assessment to be repeated. Readiness decays as staff move and data drifts, and an assessment with no expiry is treated as current indefinitely.
-->
<h3 dir="ltr" align="right">{{Company_Name}}</h3>
<h2 dir="ltr" align="right">{{AI_System_or_Program_Name}} - {{Assessment_ID}}</h1>
<h1 dir="ltr" align="center">AI READINESS ASSESSMENT</h1>
| **Date Prepared:** {{Current_Date}} | **AI Governance Lead:** {{AI_Governance_Lead_Name}} | **Prepared By:** {{Prepared_By}} |
| :--- | :--- | :--- |
---
## 1. Purpose and Scope of the Assessment
<!-- What decision this assessment supports, what is in and out of scope, how it was assessed, and what the scores rest on. -->
**Assessment Objective:** [ Add details... ]
**Assessment Scope:** [ Add details... ]
**Assessment Method:** [ Add details... ]
**Assessor and Date:** [ Add details... ]
**Evidence Basis:** [ Add details... ]
---
## 2. Data Readiness
<!-- One row per data source: does the data exist, is it fit, can it be traced, is it labelled, and is access settled. -->
| Data Source | Data Availability | Data Quality | Data Lineage and Documentation | Labelling and Ground Truth | Data Governance and Access |
| :--- | :--- | :--- | :--- | :--- | :--- |
| [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] |
| [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] |
| [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] |
---
## 3. Technical and Platform Readiness
<!-- One row per platform concern: capacity, tooling, integration, resilience, and what happens as volume grows. -->
| Concern | Current State | Gap | Cost and Effort to Close | Severity |
| :--- | :--- | ---: | :--- | :---: |
| [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] |
| [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] |
| [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] |
---
## 4. Skills and Team Readiness
<!-- One row per role: whether it is filled, what the person can actually do, and how the gap closes. -->
| Role | Filled | Level | Domain Knowledge | How the Gap Closes |
| :--- | :--- | :---: | :--- | :--- |
| [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] |
| [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] |
| [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] |
---
## 5. Organisational Readiness
<!-- One row per organisational condition, with the evidence rather than the assertion, and who owns closing it. -->
| Condition | Current State | Evidence | Owner | Note |
| :--- | :--- | :--- | :--- | :--- |
| [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] |
| [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] |
| [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] | [ Add details... ] |
---
## 6. Assessment Outcome and Route Forward
<!-- The scores, the aggregate and its weights, the gaps that block rather than slow, the recommended route, and what would reopen the assessment. -->
**Dimension Scores:** [ Add details... ]
**Weighted Overall Score:** [ Add details... ]
**Blocking Gaps:** [ Add details... ]
**Recommended Route:** [ Add details... ]
**Remediation Plan:** [ Add details... ]
**Reassessment Trigger:** [ Add details... ]
---
### Sign-off and Approvals
| Role | Name | Signature | Date |
| :--- | :--- | :---: | :---: |
| **AI / Data Lead** | {{AI_Lead_Name}} | _______________________ | [ .... - .... - .... ] |
| **Enterprise Architect / IT Lead** | {{IT_Lead_Name}} | _______________________ | [ .... - .... - .... ] |
| **Project Sponsor** | {{Project_Sponsor_Name}} | _______________________ | [ .... - .... - .... ] |
---
<div dir="ltr" align="right" style="margin-top: 20px; font-size: 12px; color: #7f8c8d;">
<span>Electronic Audit Trail: Hash SHA256: {{Audit_Trail_SHA256_Hash}}</span> <br>
<strong>Template:</strong> AI READINESS ASSESSMENT | <strong>Ref:</strong> PMO-02.03 <br>
<i>Generated on: {{Current_Timestamp}}, by <a href="https://github.com/fakhruldeen/Tasleemat/" style="color: #7f8c8d;">Tasleemat</a></i>
</div>
User Guide & Practitioner Instructions
Tasleemat Forms Guide
Project Artifact: AI Readiness Assessment
Document Reference: PMO-02.03
This document provides a comprehensive, professional reference to understand the purpose and effective usage of the AI Readiness Assessment in alignment with the Tasleemat framework.
1. What?
A dated, evidence-backed judgement on whether the organisation is in a position to build the proposed AI capability, and on what terms. It states the decision the assessment supports and its scope, how each dimension was assessed and by whom, then works through data readiness, technical and platform readiness, skills and team readiness, and organisational readiness, and closes with the dimension scores, the weighted aggregate, the gaps that block rather than slow, the recommended route with its conditions, the remediation plan, and what would cause the assessment to be repeated.
2. Why?
Because the question is asked before the work starts, and the cheapest time to discover that the labelled data does not exist, the access rights are unsettled, or the only person who understands the domain is on another project is before any of it has been built. Each of those is recoverable in week two and very expensive in month six.
The discipline the form imposes is separation. Availability is not permission. A blocked build is not a slow build. A self-declaration is not a measurement. An unweighted average is not a score. Each of these collapses two different facts into one, and the collapse is what allows a programme to proceed on a figure that concealed the gap it would later be stopped by.
3. When?
This artifact is primarily prepared, utilized, and updated during the PROJECT APPROACH AND TAILORING Process Group of the project lifecycle. It is performed before commitment to the initiative, revisited at each phase gate, and repeated on a stated trigger rather than on demand, because readiness decays as staff move and data drifts.
4. Who?
Responsibilities: Performed by the AI or ML Lead jointly with the Data Owner, since a readiness assessment of data performed without the person who owns access rights is a readiness assessment of the wrong thing. Reviewed by the Project Manager against the remediation plan, and approved by the Project Sponsor, who owns the consequence of proceeding on an optimistic reading. Where a dimension is self-declared, the declaring party is named, so that later questions about the score have someone to put to them.
Tailoring Tips
- A small exploratory initiative may assess two or three dimensions only, but should still state which were assessed and which were not, since an unstated omission reads as a pass.
- Where the capability is procured rather than built, the technical readiness section should be replaced by a supplier-capability section, and the assessment should record what the contract obliges the supplier to provide, since a capability assumed to be inherited is not a capability the organisation has.
- Scores from a previous assessment should be carried forward and compared rather than re-derived, because the comparison is what shows whether remediation worked, and a fresh absolute score cannot show that.
- It is worth recording the dimensions deliberately excluded and the reason, as these are the ones that reappear as dependencies once work is under way.
- The remediation plan may reference a separate initiative rather than duplicating it, provided each blocking gap still carries an owner and a date here, since a gap tracked elsewhere is a gap nobody is tracking.
- Where the organisation has assessed before, retain the superseded assessment rather than overwriting it; the trend is the only evidence that the process is working.
Alignment & Dependencies
1. Pre-requisites & Inputs (Upstream Dependencies)
- Mandatory:
- Business Case (PMO-01.01)
- Data & Technical Architecture Baseline
- Optional / Contextual:
- Portfolio Roadmap (PMO-00.01)
- Strategic AI Goals
2. Downstream Dependents
- Mandatory:
- AI Governance Plan (PMO-02.02)
- AI Use Case Canvas (PMO-02.04)
- Optional / Contextual:
- Resource Capacity Matrix (PMO-00.04)
- Procurement Plan (PMO-04.09.01)
5. How?
To accurately and professionally complete the AI GOVERNANCE PLAN, the
responsible party must populate the following sections based on the project
context (ensure parameters.md is referenced for global project variables):
- Assessment Objective: What decision this assessment is being made to support, and what decision it is not. A readiness assessment with no stated decision attached is a score, and a score nobody needs is the one most often abandoned.
- Assessment Scope: Which systems, processes and teams are in scope, and which are excluded. Excluding something is legitimate; excluding it without writing it down is what lets it reappear as a dependency in month four.
- Assessment Method: How each dimension was assessed: instrumented measurement, walkthrough, interview, or self-declaration. Self-declaration is legitimate and must be labelled, because an unlabelled self-declaration is indistinguishable from a measurement and is trusted accordingly.
- Assessor and Date: Who performed it, on what date, and against which version of the systems. A readiness figure without a date is a figure that decays silently.
- Evidence Basis: What the scores rest on, and where the evidence sits. A score whose source cannot be retrieved cannot be defended when it is challenged, which is the only time its accuracy matters.
- Data Availability: Whether the data the use case requires exists, at the volume and coverage needed. Availability is not the same as permission, and the gap between them is the most common reason a data-ready organisation is not an AI-ready one.
- Data Quality: Completeness, consistency, timeliness and validity, each with the measurement used. "Good quality" is a conclusion; a completeness figure against a defined field list is an input to one.
- Data Lineage and Documentation: Whether it can be traced to its origin and meaning. Lineage is what makes a defective output diagnosable rather than merely wrong, and it cannot be reconstructed after the fact.
- Labelling and Ground Truth: Whether labelled examples exist for the intended purpose, in sufficient quantity and quality. Where they do not, say so, because labelling is a programme of work with a cost and a duration, and treating it as a task hides both.
- Data Governance and Access: Who may access what, under what controls, and whether that is settled. Access rights settled late are the usual cause of a launch delay that no one predicted, and they are settled late because they involve people outside the team.
- Compute and Capacity: Whether the capacity required for training and inference exists, and at what cost. Cost per unit of work is the figure that decides whether the use case is viable at volume, and it is not known until the volume is.
- Platform and Tooling: MLOps, versioning, experiment tracking, deployment and monitoring. The tooling question is not whether a notebook runs but whether a model can be reproduced, rolled back, and monitored in production, since those are the operations a team inherits.
- Integration: Whether the system connects to the surrounding estate, and at what quality. Integration is where readiness assessments are optimistic, because a proof of concept connects to nothing and a production system must connect to everything.
- Security and Resilience: The controls in force for AI workloads, and what happens when the system is unavailable. A system whose fallback is manual reverts to a process that was automated because it was unworkable by hand.
- Scalability: Whether performance and cost hold as volume grows. A model that is accurate and unaffordable at ten times the volume is a prototype, and the assessment is where that is cheapest to discover.
- Team Composition: Who is on the team, and which of the required roles are unfilled. List the gaps by role rather than by competence, because a gap named by competence has no owner and a gap named by role has a vacancy.
- AI Skills: The specific capabilities present, at what level: building, evaluating, deploying, and operating. These are different skills and a team strong in the first may be unable to do the third, which is where readiness usually fails.
- Domain Expertise: Whether the team includes people who know the domain well enough to judge an output is wrong. Without them the team can measure performance and not interpret it, and those are not separable.
- Capacity and Availability: Whether the people named are actually available at the required fraction, given other commitments. A team rostered at half time and a team absent are the same fact expressed differently.
- Capability Building: How gaps will be closed: hire, train, partner, or buy. These have different lead times and the lead time is the constraint, not the preference.
- Leadership Sponsorship: Whether there is a sponsor who will fund the consequences as well as the work. Sponsorship that ends at approval has funded a demonstration, and the difference surfaces at the first decision the system makes that somebody disputes.
- Operating Model: Who runs the system in production, and under which service commitment. An operating model decided at go-live is an operating model negotiated in an incident.
- Change and Adoption: Who must change their work, what they gain, and what they lose. A system that makes someone's judgement redundant will not be adopted regardless of its accuracy, and adoption is not a communications problem.
- Procurement and Contracting: Whether the contracts permit the intended use, and what they permit the supplier to do with the data. These are the obligations that cannot be renegotiated after the data has been shared.
- Risk Appetite: What level of failure the organisation will accept, and who accepts it on its behalf. A risk appetite that is never stated becomes, by default, zero tolerance, which is not a position anyone chose.
- Dimension Scores: The score for each dimension, with the scale used stated. A score without its scale cannot be compared with a later assessment, and the comparison is the only reason to take the first one.
- Weighted Overall Score: The aggregate, with the weights and their justification. An unweighted average treats a dimension the business does not depend on as equal to one it cannot operate without.
- Blocking Gaps: The gaps that prevent proceeding, as distinct from those that slow it. This distinction is the assessment's actual output, and a form that records a single list cannot make it.
- Recommended Route: Proceed, proceed with conditions, remediate, or do not proceed, and the condition attached. The route without its conditions is an opinion; the conditions are what can be tracked and closed.
- Remediation Plan: What will be done, by whom, by when, and what it costs. A gap with no owner and no date is not a gap in the plan, it is a gap in the plan's assumptions.
- Reassessment Trigger: What would cause the assessment to be repeated. Readiness decays as staff move and data drifts, and an assessment with no expiry is treated as current indefinitely.
📥 Associated Templates
- 📄 Printable Template (Markdown)
- 🤖 LLM Generation Prompt
- 📊 Data Structure (JSON)
- 📈 Tabular Data (CSV)
6. Reference Example
A fully completed, gold-standard reference example illustrating this artifact in practice is available:
📖 Completed Example: 02_03_AI_Readiness_Assessment_Example.md
LLM Generation Prompt & Agent Instructions
AI GOVERNANCE PLAN - LLM GENERATION GUIDE
System Prompt / Instructions: This document serves as the detailed instruction set for generating the
AI GOVERNANCE PLAN. When asked to populate this form, use the guidance provided for each section below to accurately generate the required content. Referenceparameters.mdfor global project variables.Context & Definition: An AI readiness assessment answers a prior question to the AI governance plan. The governance plan says what is in force for a system that will exist; the readiness assessment says whether the organisation is in a position to build one, and the second question is asked earlier and answered less often.
The six sections follow the order in which a team discovers what it did not know. Scope states which decision the assessment supports, since a readiness figure with no decision attached is a score, and a score nobody needs is the one most readily abandoned. Data readiness separates availability from permission, which is the distinction most often missed: an organisation can have the data and still not be permitted to use it, and access rights are settled late precisely because they involve people outside the team. Technical readiness asks whether a model can be reproduced, rolled back and monitored in production, rather than whether a notebook runs. Skills separates building, evaluating, deploying and operating, because a team strong in the first is frequently unable to do the last, which is where readiness actually fails. Organisational readiness covers the conditions outside the team's control: sponsorship that funds the consequences as well as the work, an operating model, contracts that permit the intended use, and a stated appetite for failure. The outcome section separates blocking gaps from those that merely slow, because that distinction is the assessment's actual output and a single list of gaps cannot express it.
The failure mode is the undifferentiated average. A readiness score that weights every dimension equally treats a capability the business does not depend on as equal to one it cannot operate without, and the aggregate then conceals the single gap that matters. So record the scale, the weights and their justification, and the severity of each gap separately from the score. Where a dimension was assessed by self-declaration rather than by measurement, say so: self-declaration is legitimate and common, and it becomes a problem only when it is not labelled and is therefore indistinguishable from a measurement. An assessment should also record its own expiry, since readiness decays as people move and data drifts, and an assessment with no reassessment trigger is treated as current indefinitely.
Alignment & Dependencies: * Pre-requisites (Inputs): * Mandatory: Business Case (PMO-01.01), Data & Technical Architecture Baseline * Optional: Portfolio Roadmap (PMO-00.01), Strategic AI Goals * Downstream Dependents: * Mandatory: AI Governance Plan (PMO-02.02), AI Use Case Canvas (PMO-02.04) * Optional: Resource Capacity Matrix (PMO-00.04), Procurement Plan (PMO-04.09.01)
Purpose and Scope of the Assessment
Assessment Objective
Instruction: What decision this assessment is being made to support, and what decision it is not. A readiness assessment with no stated decision attached is a score, and a score nobody needs is the one most often abandoned.
Generated value: [ Add details... ]
Assessment Scope
Instruction: Which systems, processes and teams are in scope, and which are excluded. Excluding something is legitimate; excluding it without writing it down is what lets it reappear as a dependency in month four.
Generated value: [ Add details... ]
Assessment Method
Instruction: How each dimension was assessed: instrumented measurement, walkthrough, interview, or self-declaration. Self-declaration is legitimate and must be labelled, because an unlabelled self-declaration is indistinguishable from a measurement and is trusted accordingly.
Generated value: [ Add details... ]
Assessor and Date
Instruction: Who performed it, on what date, and against which version of the systems. A readiness figure without a date is a figure that decays silently.
Generated value: [ Add details... ]
Evidence Basis
Instruction: What the scores rest on, and where the evidence sits. A score whose source cannot be retrieved cannot be defended when it is challenged, which is the only time its accuracy matters.
Generated value: [ Add details... ]
Data Readiness
Data Availability
Instruction: Whether the data the use case requires exists, at the volume and coverage needed. Availability is not the same as permission, and the gap between them is the most common reason a data-ready organisation is not an AI-ready one.
Generated value: [ Add details... ]
Data Quality
Instruction: Completeness, consistency, timeliness and validity, each with the measurement used. "Good quality" is a conclusion; a completeness figure against a defined field list is an input to one.
Generated value: [ Add details... ]
Data Lineage and Documentation
Instruction: Whether it can be traced to its origin and meaning. Lineage is what makes a defective output diagnosable rather than merely wrong, and it cannot be reconstructed after the fact.
Generated value: [ Add details... ]
Labelling and Ground Truth
Instruction: Whether labelled examples exist for the intended purpose, in sufficient quantity and quality. Where they do not, say so, because labelling is a programme of work with a cost and a duration, and treating it as a task hides both.
Generated value: [ Add details... ]
Data Governance and Access
Instruction: Who may access what, under what controls, and whether that is settled. Access rights settled late are the usual cause of a launch delay that no one predicted, and they are settled late because they involve people outside the team.
Generated value: [ Add details... ]
Technical and Platform Readiness
Compute and Capacity
Instruction: Whether the capacity required for training and inference exists, and at what cost. Cost per unit of work is the figure that decides whether the use case is viable at volume, and it is not known until the volume is.
Generated value: [ Add details... ]
Platform and Tooling
Instruction: MLOps, versioning, experiment tracking, deployment and monitoring. The tooling question is not whether a notebook runs but whether a model can be reproduced, rolled back, and monitored in production, since those are the operations a team inherits.
Generated value: [ Add details... ]
Integration
Instruction: Whether the system connects to the surrounding estate, and at what quality. Integration is where readiness assessments are optimistic, because a proof of concept connects to nothing and a production system must connect to everything.
Generated value: [ Add details... ]
Security and Resilience
Instruction: The controls in force for AI workloads, and what happens when the system is unavailable. A system whose fallback is manual reverts to a process that was automated because it was unworkable by hand.
Generated value: [ Add details... ]
Scalability
Instruction: Whether performance and cost hold as volume grows. A model that is accurate and unaffordable at ten times the volume is a prototype, and the assessment is where that is cheapest to discover.
Generated value: [ Add details... ]
Skills and Team Readiness
Team Composition
Instruction: Who is on the team, and which of the required roles are unfilled. List the gaps by role rather than by competence, because a gap named by competence has no owner and a gap named by role has a vacancy.
Generated value: [ Add details... ]
AI Skills
Instruction: The specific capabilities present, at what level: building, evaluating, deploying, and operating. These are different skills and a team strong in the first may be unable to do the third, which is where readiness usually fails.
Generated value: [ Add details... ]
Domain Expertise
Instruction: Whether the team includes people who know the domain well enough to judge an output is wrong. Without them the team can measure performance and not interpret it, and those are not separable.
Generated value: [ Add details... ]
Capacity and Availability
Instruction: Whether the people named are actually available at the required fraction, given other commitments. A team rostered at half time and a team absent are the same fact expressed differently.
Generated value: [ Add details... ]
Capability Building
Instruction: How gaps will be closed: hire, train, partner, or buy. These have different lead times and the lead time is the constraint, not the preference.
Generated value: [ Add details... ]
Organisational Readiness
Leadership Sponsorship
Instruction: Whether there is a sponsor who will fund the consequences as well as the work. Sponsorship that ends at approval has funded a demonstration, and the difference surfaces at the first decision the system makes that somebody disputes.
Generated value: [ Add details... ]
Operating Model
Instruction: Who runs the system in production, and under which service commitment. An operating model decided at go-live is an operating model negotiated in an incident.
Generated value: [ Add details... ]
Change and Adoption
Instruction: Who must change their work, what they gain, and what they lose. A system that makes someone's judgement redundant will not be adopted regardless of its accuracy, and adoption is not a communications problem.
Generated value: [ Add details... ]
Procurement and Contracting
Instruction: Whether the contracts permit the intended use, and what they permit the supplier to do with the data. These are the obligations that cannot be renegotiated after the data has been shared.
Generated value: [ Add details... ]
Risk Appetite
Instruction: What level of failure the organisation will accept, and who accepts it on its behalf. A risk appetite that is never stated becomes, by default, zero tolerance, which is not a position anyone chose.
Generated value: [ Add details... ]
Assessment Outcome and Route Forward
Dimension Scores
Instruction: The score for each dimension, with the scale used stated. A score without its scale cannot be compared with a later assessment, and the comparison is the only reason to take the first one.
Generated value: [ Add details... ]
Weighted Overall Score
Instruction: The aggregate, with the weights and their justification. An unweighted average treats a dimension the business does not depend on as equal to one it cannot operate without.
Generated value: [ Add details... ]
Blocking Gaps
Instruction: The gaps that prevent proceeding, as distinct from those that slow it. This distinction is the assessment's actual output, and a form that records a single list cannot make it.
Generated value: [ Add details... ]
Recommended Route
Instruction: Proceed, proceed with conditions, remediate, or do not proceed, and the condition attached. The route without its conditions is an opinion; the conditions are what can be tracked and closed.
Generated value: [ Add details... ]
Remediation Plan
Instruction: What will be done, by whom, by when, and what it costs. A gap with no owner and no date is not a gap in the plan, it is a gap in the plan's assumptions.
Generated value: [ Add details... ]
Reassessment Trigger
Instruction: What would cause the assessment to be repeated. Readiness decays as staff move and data drifts, and an assessment with no expiry is treated as current indefinitely.
Generated value: [ Add details... ]
AI Readiness Assessment (Reference Example)
🏆 Gold Standard Reference Example: This document illustrates a fully completed, production-grade artifact adhering to the Tasleemat PMO Framework (
PMO-02.03). All company names, project references, and figures are realistic fictional simulations.
Apex Global Solutions
Apex Enterprise Cognitive AI System - ASSESS-2026-01
AI READINESS ASSESSMENT
---
## 1. Purpose and Scope of the Assessment
**Assessment Objective:** Deliver operational excellence, process automation, and unified cloud integration adhering to enterprise standards.
**Assessment Scope:** Deliver operational excellence, process automation, and unified cloud integration adhering to enterprise standards.
**Assessment Method:** Fully defined and aligned with Apex Global Solutions operational baseline and project objectives.
**Assessor and Date:** Tariq Al-Mansoor, PfMP (Lead PMO Assessor) - 2026-03-15
**Evidence Basis:** Fully defined and aligned with Apex Global Solutions operational baseline and project objectives.
---
## 2. Data Readiness
| Data Source | Data Availability | Data Quality | Data Lineage and Documentation | Labelling and Ground Truth | Data Governance and Access |
| :--- | :--- | :--- | :--- | :--- | :--- |
| Automated database ETL pipeline extraction | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline |
| Secure electronic archiving with compliance audit | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline |
| API ingestion streams with tokenized logging | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline |
---
## 3. Technical and Platform Readiness
| Concern | Current State | Gap | Cost and Effort to Close | Severity |
| :--- | :--- | ---: | :--- | :---: |
| Approved and aligned with Apex Global Solutions governance baseline | In Progress | Approved and aligned with Apex Global Solutions governance baseline | $950,000 USD | Medium (Subject to quarterly audit) |
| Approved and aligned with Apex Global Solutions governance baseline | Completed | Approved and aligned with Apex Global Solutions governance baseline | $1,150,000 USD | Low (Within acceptable operating bounds) |
| Approved and aligned with Apex Global Solutions governance baseline | Planned | Approved and aligned with Apex Global Solutions governance baseline | $780,000 USD | High (Requires mandatory human approval) |
---
## 4. Skills and Team Readiness
| Role | Filled | Level | Domain Knowledge | How the Gap Closes |
| :--- | :--- | :---: | :--- | :--- |
| Strategic executive oversight and resource authorization | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline | Technical & Integration | Approved and aligned with Apex Global Solutions governance baseline |
| Business process owner and final acceptance authority | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline | Operational & Functional | Approved and aligned with Apex Global Solutions governance baseline |
| Primary commercial user champion and UAT stakeholder | Approved and aligned with Apex Global Solutions governance baseline | Approved and aligned with Apex Global Solutions governance baseline | Governance & Compliance | Approved and aligned with Apex Global Solutions governance baseline |
---
## 5. Organisational Readiness
| Condition | Current State | Evidence | Owner | Note |
| :--- | :--- | :--- | :--- | :--- |
| Approved and aligned with Apex Global Solutions governance baseline | In Progress | INIT-01 | Elena Vance, PfMP | Approved and aligned with Apex Global Solutions governance baseline |
| Approved and aligned with Apex Global Solutions governance baseline | Completed | REQ-02 | Faisal Al-Harbi, PMP | Approved and aligned with Apex Global Solutions governance baseline |
| Approved and aligned with Apex Global Solutions governance baseline | Planned | ACT-03 | Tariq Al-Mansoor, PfMP | Approved and aligned with Apex Global Solutions governance baseline |
---
## 6. Assessment Outcome and Route Forward
**Dimension Scores:** Fully defined and aligned with Apex Global Solutions operational baseline and project objectives.
**Weighted Overall Score:** Fully defined and aligned with Apex Global Solutions operational baseline and project objectives.
**Blocking Gaps:** Fully defined and aligned with Apex Global Solutions operational baseline and project objectives.
**Recommended Route:** Full migration to cloud-native unified ERP platform executed across 3 structured rollout waves.
**Remediation Plan:** Fully defined and aligned with Apex Global Solutions operational baseline and project objectives.
**Reassessment Trigger:** Scope baseline shift > 10%, schedule slip > 2 weeks, or regulatory framework modifications.
---
### Sign-off and Approvals
| Role | Name | Signature | Date |
| :--- | :--- | :---: | :---: |
| **AI / Data Lead** | Dr. Rayan Al-Sulaiman (Lead AI & Data Scientist) | [Electronically Signed] | 2026-03-18 |
| **Enterprise Architect / IT Lead** | Approved - IT Lead Name | [Electronically Signed] | 2026-03-18 |
| **Project Sponsor** | Dr. Muna Al-Ghamdi (Executive VP of Technology) | [Electronically Signed] | 2026-03-18 |
---
Template: AI READINESS ASSESSMENT | Ref: PMO-02.03
Generated on: 2026-03-15 10:00 UTC, by Tasleemat
Generated on: 2026-03-15 10:00 UTC, by Tasleemat
Draft 2020-12 JSON Schema
{
"$schema": "https://json-schema.org/draft/2020-12/schema",
"$id": "https://tasleemat.pmo/schemas/completed/PMO-02.03.schema.json",
"title": "Completed AI Readiness Assessment Data Contract",
"description": "Additive structural schema validating completed AI Readiness Assessment artifact data payloads (PMO-02.03).",
"type": "object",
"properties": {
"artifact_id": {
"type": "string",
"const": "PMO-02.03"
},
"metadata": {
"type": "object",
"properties": {
"project_name": {
"type": "string",
"minLength": 1
},
"project_code": {
"type": "string"
},
"date_prepared": {
"type": "string",
"format": "date"
},
"project_manager": {
"type": "string",
"minLength": 1
},
"prepared_by": {
"type": "string",
"minLength": 1
},
"version": {
"type": "string"
},
"status": {
"type": "string",
"enum": [
"draft",
"baselined",
"in_review",
"approved"
]
}
},
"required": [
"project_name",
"date_prepared",
"project_manager",
"prepared_by"
]
},
"purpose_and_scope_of_the_assessment": {
"type": "object",
"properties": {
"assessment_objective": {
"type": "string",
"minLength": 1,
"description": "What decision this assessment is being made to support, and what decision it is not. A readiness assessment with no stated decision attached is a score, and a score nobody needs is the one most often abandoned."
},
"assessment_scope": {
"type": "string",
"minLength": 1,
"description": "Which systems, processes and teams are in scope, and which are excluded. Excluding something is legitimate; excluding it without writing it down is what lets it reappear as a dependency in month four."
},
"assessment_method": {
"type": "string",
"minLength": 1,
"description": "How each dimension was assessed: instrumented measurement, walkthrough, interview, or self-declaration. Self-declaration is legitimate and must be labelled, because an unlabelled self-declaration is indistinguishable from a measurement and is trusted accordingly."
},
"assessor_and_date": {
"type": "string",
"minLength": 1,
"description": "Who performed it, on what date, and against which version of the systems. A readiness figure without a date is a figure that decays silently."
},
"evidence_basis": {
"type": "string",
"minLength": 1,
"description": "What the scores rest on, and where the evidence sits. A score whose source cannot be retrieved cannot be defended when it is challenged, which is the only time its accuracy matters."
}
},
"required": [
"assessment_objective",
"assessment_scope",
"assessment_method",
"assessor_and_date",
"evidence_basis"
]
},
"data_readiness": {
"type": "object",
"properties": {
"data_availability": {
"type": "string",
"minLength": 1,
"description": "Whether the data the use case requires exists, at the volume and coverage needed. Availability is not the same as permission, and the gap between them is the most common reason a data-ready organisation is not an AI-ready one."
},
"data_quality": {
"type": "string",
"minLength": 1,
"description": "Completeness, consistency, timeliness and validity, each with the measurement used. \"Good quality\" is a conclusion; a completeness figure against a defined field list is an input to one."
},
"data_lineage_and_documentation": {
"type": "string",
"minLength": 1,
"description": "Whether it can be traced to its origin and meaning. Lineage is what makes a defective output diagnosable rather than merely wrong, and it cannot be reconstructed after the fact."
},
"labelling_and_ground_truth": {
"type": "string",
"minLength": 1,
"description": "Whether labelled examples exist for the intended purpose, in sufficient quantity and quality. Where they do not, say so, because labelling is a programme of work with a cost and a duration, and treating it as a task hides both."
},
"data_governance_and_access": {
"type": "string",
"minLength": 1,
"description": "Who may access what, under what controls, and whether that is settled. Access rights settled late are the usual cause of a launch delay that no one predicted, and they are settled late because they involve people outside the team."
}
},
"required": [
"data_availability",
"data_quality",
"data_lineage_and_documentation",
"labelling_and_ground_truth",
"data_governance_and_access"
]
},
"technical_and_platform_readiness": {
"type": "object",
"properties": {
"compute_and_capacity": {
"type": "string",
"minLength": 1,
"description": "Whether the capacity required for training and inference exists, and at what cost. Cost per unit of work is the figure that decides whether the use case is viable at volume, and it is not known until the volume is."
},
"platform_and_tooling": {
"type": "string",
"minLength": 1,
"description": "MLOps, versioning, experiment tracking, deployment and monitoring. The tooling question is not whether a notebook runs but whether a model can be reproduced, rolled back, and monitored in production, since those are the operations a team inherits."
},
"integration": {
"type": "string",
"minLength": 1,
"description": "Whether the system connects to the surrounding estate, and at what quality. Integration is where readiness assessments are optimistic, because a proof of concept connects to nothing and a production system must connect to everything."
},
"security_and_resilience": {
"type": "string",
"minLength": 1,
"description": "The controls in force for AI workloads, and what happens when the system is unavailable. A system whose fallback is manual reverts to a process that was automated because it was unworkable by hand."
},
"scalability": {
"type": "string",
"minLength": 1,
"description": "Whether performance and cost hold as volume grows. A model that is accurate and unaffordable at ten times the volume is a prototype, and the assessment is where that is cheapest to discover."
}
},
"required": [
"compute_and_capacity",
"platform_and_tooling",
"integration",
"security_and_resilience",
"scalability"
]
},
"skills_and_team_readiness": {
"type": "object",
"properties": {
"team_composition": {
"type": "string",
"minLength": 1,
"description": "Who is on the team, and which of the required roles are unfilled. List the gaps by role rather than by competence, because a gap named by competence has no owner and a gap named by role has a vacancy."
},
"ai_skills": {
"type": "string",
"minLength": 1,
"description": "The specific capabilities present, at what level: building, evaluating, deploying, and operating. These are different skills and a team strong in the first may be unable to do the third, which is where readiness usually fails."
},
"domain_expertise": {
"type": "string",
"minLength": 1,
"description": "Whether the team includes people who know the domain well enough to judge an output is wrong. Without them the team can measure performance and not interpret it, and those are not separable."
},
"capacity_and_availability": {
"type": "string",
"minLength": 1,
"description": "Whether the people named are actually available at the required fraction, given other commitments. A team rostered at half time and a team absent are the same fact expressed differently."
},
"capability_building": {
"type": "string",
"minLength": 1,
"description": "How gaps will be closed: hire, train, partner, or buy. These have different lead times and the lead time is the constraint, not the preference."
}
},
"required": [
"team_composition",
"ai_skills",
"domain_expertise",
"capacity_and_availability",
"capability_building"
]
},
"organisational_readiness": {
"type": "object",
"properties": {
"leadership_sponsorship": {
"type": "string",
"minLength": 1,
"description": "Whether there is a sponsor who will fund the consequences as well as the work. Sponsorship that ends at approval has funded a demonstration, and the difference surfaces at the first decision the system makes that somebody disputes."
},
"operating_model": {
"type": "string",
"minLength": 1,
"description": "Who runs the system in production, and under which service commitment. An operating model decided at go-live is an operating model negotiated in an incident."
},
"change_and_adoption": {
"type": "string",
"minLength": 1,
"description": "Who must change their work, what they gain, and what they lose. A system that makes someone's judgement redundant will not be adopted regardless of its accuracy, and adoption is not a communications problem."
},
"procurement_and_contracting": {
"type": "string",
"minLength": 1,
"description": "Whether the contracts permit the intended use, and what they permit the supplier to do with the data. These are the obligations that cannot be renegotiated after the data has been shared."
},
"risk_appetite": {
"type": "string",
"minLength": 1,
"description": "What level of failure the organisation will accept, and who accepts it on its behalf. A risk appetite that is never stated becomes, by default, zero tolerance, which is not a position anyone chose."
}
},
"required": [
"leadership_sponsorship",
"operating_model",
"change_and_adoption",
"procurement_and_contracting",
"risk_appetite"
]
},
"assessment_outcome_and_route_forward": {
"type": "object",
"properties": {
"dimension_scores": {
"type": "string",
"minLength": 1,
"description": "The score for each dimension, with the scale used stated. A score without its scale cannot be compared with a later assessment, and the comparison is the only reason to take the first one."
},
"weighted_overall_score": {
"type": "string",
"minLength": 1,
"description": "The aggregate, with the weights and their justification. An unweighted average treats a dimension the business does not depend on as equal to one it cannot operate without."
},
"blocking_gaps": {
"type": "string",
"minLength": 1,
"description": "The gaps that prevent proceeding, as distinct from those that slow it. This distinction is the assessment's actual output, and a form that records a single list cannot make it."
},
"recommended_route": {
"type": "string",
"minLength": 1,
"description": "Proceed, proceed with conditions, remediate, or do not proceed, and the condition attached. The route without its conditions is an opinion; the conditions are what can be tracked and closed."
},
"remediation_plan": {
"type": "string",
"minLength": 1,
"description": "What will be done, by whom, by when, and what it costs. A gap with no owner and no date is not a gap in the plan, it is a gap in the plan's assumptions."
},
"reassessment_trigger": {
"type": "string",
"minLength": 1,
"description": "What would cause the assessment to be repeated. Readiness decays as staff move and data drifts, and an assessment with no expiry is treated as current indefinitely."
}
},
"required": [
"dimension_scores",
"weighted_overall_score",
"blocking_gaps",
"recommended_route",
"remediation_plan",
"reassessment_trigger"
]
}
},
"required": [
"artifact_id",
"metadata",
"purpose_and_scope_of_the_assessment",
"data_readiness",
"technical_and_platform_readiness",
"skills_and_team_readiness",
"organisational_readiness",
"assessment_outcome_and_route_forward"
]
}
📋 Form Field Definitions Dictionary (Legacy Specification)
{
"_llm_instructions": "Fill out the 'project_title' and 'date_prepared' properties, and the 'value' property of each field below, based on the available project context. Refer to parameters.md for the shared project variables. Name the model version, the group affected, and the threshold that triggers action, rather than recording a category; a governance plan that says 'encrypted', 'minimised' and 'monitored' describes an intention and not a system, and the difference only becomes visible when something goes wrong and no one can say what was in force.",
"form_name": "AI Readiness Assessment",
"document_reference": "PMO-02.03",
"project_title": "",
"date_prepared": "",
"fields": {
"f01_Assessment_Objective": {
"section": "Purpose and Scope of the Assessment",
"label": "Assessment Objective",
"guidance": "What decision this assessment is being made to support, and what decision it is not. A readiness assessment with no stated decision attached is a score, and a score nobody needs is the one most often abandoned.",
"value": ""
},
"f02_Assessment_Scope": {
"section": "Purpose and Scope of the Assessment",
"label": "Assessment Scope",
"guidance": "Which systems, processes and teams are in scope, and which are excluded. Excluding something is legitimate; excluding it without writing it down is what lets it reappear as a dependency in month four.",
"value": ""
},
"f03_Assessment_Method": {
"section": "Purpose and Scope of the Assessment",
"label": "Assessment Method",
"guidance": "How each dimension was assessed: instrumented measurement, walkthrough, interview, or self-declaration. Self-declaration is legitimate and must be labelled, because an unlabelled self-declaration is indistinguishable from a measurement and is trusted accordingly.",
"value": ""
},
"f04_Assessor_and_Date": {
"section": "Purpose and Scope of the Assessment",
"label": "Assessor and Date",
"guidance": "Who performed it, on what date, and against which version of the systems. A readiness figure without a date is a figure that decays silently.",
"value": ""
},
"f05_Evidence_Basis": {
"section": "Purpose and Scope of the Assessment",
"label": "Evidence Basis",
"guidance": "What the scores rest on, and where the evidence sits. A score whose source cannot be retrieved cannot be defended when it is challenged, which is the only time its accuracy matters.",
"value": ""
},
"f06_Data_Availability": {
"section": "Data Readiness",
"label": "Data Availability",
"guidance": "Whether the data the use case requires exists, at the volume and coverage needed. Availability is not the same as permission, and the gap between them is the most common reason a data-ready organisation is not an AI-ready one.",
"value": ""
},
"f07_Data_Quality": {
"section": "Data Readiness",
"label": "Data Quality",
"guidance": "Completeness, consistency, timeliness and validity, each with the measurement used. \"Good quality\" is a conclusion; a completeness figure against a defined field list is an input to one.",
"value": ""
},
"f08_Data_Lineage_and_Documentation": {
"section": "Data Readiness",
"label": "Data Lineage and Documentation",
"guidance": "Whether it can be traced to its origin and meaning. Lineage is what makes a defective output diagnosable rather than merely wrong, and it cannot be reconstructed after the fact.",
"value": ""
},
"f09_Labelling_and_Ground_Truth": {
"section": "Data Readiness",
"label": "Labelling and Ground Truth",
"guidance": "Whether labelled examples exist for the intended purpose, in sufficient quantity and quality. Where they do not, say so, because labelling is a programme of work with a cost and a duration, and treating it as a task hides both.",
"value": ""
},
"f10_Data_Governance_and_Access": {
"section": "Data Readiness",
"label": "Data Governance and Access",
"guidance": "Who may access what, under what controls, and whether that is settled. Access rights settled late are the usual cause of a launch delay that no one predicted, and they are settled late because they involve people outside the team.",
"value": ""
},
"f11_Compute_and_Capacity": {
"section": "Technical and Platform Readiness",
"label": "Compute and Capacity",
"guidance": "Whether the capacity required for training and inference exists, and at what cost. Cost per unit of work is the figure that decides whether the use case is viable at volume, and it is not known until the volume is.",
"value": ""
},
"f12_Platform_and_Tooling": {
"section": "Technical and Platform Readiness",
"label": "Platform and Tooling",
"guidance": "MLOps, versioning, experiment tracking, deployment and monitoring. The tooling question is not whether a notebook runs but whether a model can be reproduced, rolled back, and monitored in production, since those are the operations a team inherits.",
"value": ""
},
"f13_Integration": {
"section": "Technical and Platform Readiness",
"label": "Integration",
"guidance": "Whether the system connects to the surrounding estate, and at what quality. Integration is where readiness assessments are optimistic, because a proof of concept connects to nothing and a production system must connect to everything.",
"value": ""
},
"f14_Security_and_Resilience": {
"section": "Technical and Platform Readiness",
"label": "Security and Resilience",
"guidance": "The controls in force for AI workloads, and what happens when the system is unavailable. A system whose fallback is manual reverts to a process that was automated because it was unworkable by hand.",
"value": ""
},
"f15_Scalability": {
"section": "Technical and Platform Readiness",
"label": "Scalability",
"guidance": "Whether performance and cost hold as volume grows. A model that is accurate and unaffordable at ten times the volume is a prototype, and the assessment is where that is cheapest to discover.",
"value": ""
},
"f16_Team_Composition": {
"section": "Skills and Team Readiness",
"label": "Team Composition",
"guidance": "Who is on the team, and which of the required roles are unfilled. List the gaps by role rather than by competence, because a gap named by competence has no owner and a gap named by role has a vacancy.",
"value": ""
},
"f17_AI_Skills": {
"section": "Skills and Team Readiness",
"label": "AI Skills",
"guidance": "The specific capabilities present, at what level: building, evaluating, deploying, and operating. These are different skills and a team strong in the first may be unable to do the third, which is where readiness usually fails.",
"value": ""
},
"f18_Domain_Expertise": {
"section": "Skills and Team Readiness",
"label": "Domain Expertise",
"guidance": "Whether the team includes people who know the domain well enough to judge an output is wrong. Without them the team can measure performance and not interpret it, and those are not separable.",
"value": ""
},
"f19_Capacity_and_Availability": {
"section": "Skills and Team Readiness",
"label": "Capacity and Availability",
"guidance": "Whether the people named are actually available at the required fraction, given other commitments. A team rostered at half time and a team absent are the same fact expressed differently.",
"value": ""
},
"f20_Capability_Building": {
"section": "Skills and Team Readiness",
"label": "Capability Building",
"guidance": "How gaps will be closed: hire, train, partner, or buy. These have different lead times and the lead time is the constraint, not the preference.",
"value": ""
},
"f21_Leadership_Sponsorship": {
"section": "Organisational Readiness",
"label": "Leadership Sponsorship",
"guidance": "Whether there is a sponsor who will fund the consequences as well as the work. Sponsorship that ends at approval has funded a demonstration, and the difference surfaces at the first decision the system makes that somebody disputes.",
"value": ""
},
"f22_Operating_Model": {
"section": "Organisational Readiness",
"label": "Operating Model",
"guidance": "Who runs the system in production, and under which service commitment. An operating model decided at go-live is an operating model negotiated in an incident.",
"value": ""
},
"f23_Change_and_Adoption": {
"section": "Organisational Readiness",
"label": "Change and Adoption",
"guidance": "Who must change their work, what they gain, and what they lose. A system that makes someone's judgement redundant will not be adopted regardless of its accuracy, and adoption is not a communications problem.",
"value": ""
},
"f24_Procurement_and_Contracting": {
"section": "Organisational Readiness",
"label": "Procurement and Contracting",
"guidance": "Whether the contracts permit the intended use, and what they permit the supplier to do with the data. These are the obligations that cannot be renegotiated after the data has been shared.",
"value": ""
},
"f25_Risk_Appetite": {
"section": "Organisational Readiness",
"label": "Risk Appetite",
"guidance": "What level of failure the organisation will accept, and who accepts it on its behalf. A risk appetite that is never stated becomes, by default, zero tolerance, which is not a position anyone chose.",
"value": ""
},
"f26_Dimension_Scores": {
"section": "Assessment Outcome and Route Forward",
"label": "Dimension Scores",
"guidance": "The score for each dimension, with the scale used stated. A score without its scale cannot be compared with a later assessment, and the comparison is the only reason to take the first one.",
"value": ""
},
"f27_Weighted_Overall_Score": {
"section": "Assessment Outcome and Route Forward",
"label": "Weighted Overall Score",
"guidance": "The aggregate, with the weights and their justification. An unweighted average treats a dimension the business does not depend on as equal to one it cannot operate without.",
"value": ""
},
"f28_Blocking_Gaps": {
"section": "Assessment Outcome and Route Forward",
"label": "Blocking Gaps",
"guidance": "The gaps that prevent proceeding, as distinct from those that slow it. This distinction is the assessment's actual output, and a form that records a single list cannot make it.",
"value": ""
},
"f29_Recommended_Route": {
"section": "Assessment Outcome and Route Forward",
"label": "Recommended Route",
"guidance": "Proceed, proceed with conditions, remediate, or do not proceed, and the condition attached. The route without its conditions is an opinion; the conditions are what can be tracked and closed.",
"value": ""
},
"f30_Remediation_Plan": {
"section": "Assessment Outcome and Route Forward",
"label": "Remediation Plan",
"guidance": "What will be done, by whom, by when, and what it costs. A gap with no owner and no date is not a gap in the plan, it is a gap in the plan's assumptions.",
"value": ""
},
"f31_Reassessment_Trigger": {
"section": "Assessment Outcome and Route Forward",
"label": "Reassessment Trigger",
"guidance": "What would cause the assessment to be repeated. Readiness decays as staff move and data drifts, and an assessment with no expiry is treated as current indefinitely.",
"value": ""
}
}
}